120 tons of steel for white gold

In Aarberg, a new combined heat and power plant is under construction next to the sugar refinery. The heart of this power plant is the turbine-generator unit, which generates electricity from the steam of the plant.

On behalf of MAN Energy Solutions, BAUBERGER first unloaded the 88-ton base frame by means of a 350-metric-ton mobile crane, then placed it in the building on sliding tracks and lowered it onto the damping elements by means of a lifting system. Subsequently, the 30-ton generator was installed using a similar procedure and placed on the base frame with to-the-millimetre precision.
Almost 80 tons of auxiliary material and special tools were used for this project, which is the same as around four full truck loads.

When ready for operation, the plant will burn old wood and generates steam. The generated steam will be used during sugar production for processing and producing electricity; outside the sugar campaigns steam is used for internal means and the production of electricity.

 

About MAN Energy Solutions SE:

MAN Energy Solutions SE is the world’s leading supplier of large diesel and gas engines as well as turbomachinery. The product portfolio includes two- and four-stroke engines for maritime and stationary applications, turbochargers and propellers as well as gas and steam turbines, compressors and chemical reactors. MAN Energy Solutions has its headquarters in Augsburg/Germany and employs around 14,000 people at more than 120 locations worldwide.

Special equipment

  • Lifting unit 90t with rails and girders
  • Forklift truck 7t
  • Aerial work platform 8m
  • 50t industrial skates
  • Truck loading crane 100mt

Team

Hansjörg, Roli, Erich, Sämi