Delivery and installation of eight new rollers for Lindt & Sprüngli (Schweiz) AG.
Video: Lukas Pitsch / proImageHub
Complex lifting of a 7.5 tonne MRI at Lucerne railway station.
Video: Lukas Pitsch / proImageHub
Unloading and setting up a 43t machining centre in Eschenbach.
Video: Lukas Pitsch / proImageHub
Exchange of three heavy-duty machines at Sauber Motosport AG in Hinwil.
Video: Lukas Pitsch / proImageHub
Stacking of 26 steel staircase elements.
Video: Lukas Pitsch / proImageHub
We delivered a 5.2-ton emergency power generator and installed it on the roof.
Video: Lukas Pitsch / proImageHub
Unloading and bringing in a 38t universal machining center.
Video: Lukas Pitsch / proImageHub
Bringing in a 16t underfloor lathe in the VBZ tram depot in Zurich.
Video: Lukas Pitsch / proImageHub
Bringing in an 85t press, hanging on two mobile cranes and flying transfer to lifting column system.
Video: Lukas Pitsch / proImageHub
Unloading and bringing in more than 50 truckloads for the new Emmi cheese factory.
Video: Lukas Pitsch / proImageHub
Industrial relocation of a 12t machine through the roof and bringing a second one into the production hall.
Video: Lukas Pitsch / proImageHub
Replacing an 18t can filling line incl. can seame at Feldschlösschen.
Video: Lukas Pitsch / proImageHub
Bringing in a 23t CNC machining center into a production hall.
Video: Lukas Pitsch / proImageHub
Five production lines move to a new factory.
Video: Lukas Pitsch / proImageHub
Replacement of two escalators at the SBB station at Geneva Airport.
A 30-tonne press had to be taken out of the production hall at Heggli & Gubler AG.
Video production: Lukas Pitsch / proImageHub
Bringing in a heavy 65t tank into the BAUBERGER heavy goods warehouse in Elgg (ZH).
Relocating several manufacturing units with a weight of up to 18t each at Hans Eberle AG.
Video production by Lukas Pitsch / proImageHub
Bringing a new panetary strander machine into the production facilities at Huber+Suhner AG.
Video production by Lukas Pitsch / proImageHub
20 trucks full of material for a new production plant at Lindt & Sprüngli.
Video production by Lukas Pitsch / proImageHub
The new corporate film of BAUBERGER AG. This is how factories travel in 2020 and in the future!
Video production by Lukas Pitsch / proImageHub
BAUBERGER was responsible for moving existing machines and unloading at Stöckli Swiss Sports AG, bringing in, placing, including pre-leveling new machines and systems between 1.5 and 7 tons.
Video production by Lukas Pitsch / proImageHub
In order to further optimize the production processes, Wilhelm Schmidlin AG in Oberarth (CH) purchased a new hydraulic 1400 ton press from Hydraulico. BAUBERGER was not only responsible for bringing in the new press, but also managed the unloading and erection process while Welti-Furrer Pneukran und Spezialtransporte AG transported the press from Denmark to Switzerland. A completely new production hall has been built for the new press with a dead weight of 165t and a height of over 7m.
Video production by Lukas Pitsch / proImageHub
As a reaction to the COVID-19 pandemic, the federal government and the canton of Zurich purchased manufacturing machinery to ramp up production of face masks in Switzerland. As being part of www.luftbruecke.ch BAUBERGER carried out the transportation of two face mask production machines (approx. 60m3) for Autefa AG and related auxiliary material (another approx. 60m3) for FLAWA Consumer GmbH from China to Switzerland.
Three new ENGEL injection moulding machines were recently delivered and installed at the company premises of Nolato Treff in Degersheim. The three units with a weight of up to 20 tonnes were lifted up by a 100-tonne mobile crane from the truck to our auxiliary platform at a height of five meters.
Video production by Lukas Pitsch / proImageHub
Bringing-in of the two MRI’s „Magnetom Prisma“ and „Magnetom Terra“ into the new building of sitem-insel in Bern. The MRI’s were moved to the basement floor through a floor opening with a size of 3x3m (while not having more than a few centimeters of space left) with our HUBYLIFT.
Video production by Lukas Pitsch / proImageHub
After closing-time of a shopping center the BAUBERGER elves started with their work. Within 24-hours (Saturday evening until Sunday afternoon) they removed six escalators and replaced them with six new ones.
Video production by Lukas Pitsch / proImageHub
COMET Group in Flamatt is moving into a new production site. Again BAUBERGER is th proved partner for this relocation.
Video production by Lukas Pitsch / proImageHub
Bringing-in procedure of a filling system CFA 612-35 at Elsa in Estavayer-le-Lac (Switzerland).
Video production by Lukas Pitsch / proImageHub
Integration of a 17-to steamer on a height of 3m into a new production line for material processing at Cilander AG in Herisau
Video production by Lukas Pitsch / proImageHub
Bringing-in procedure of a 7,2-ton CNC lathe with a mobile crane and transport box directly to the 2nd floor
Video production by Lukas Pitsch / proImageHub
72 tons export to the USA
Video production by Rebecca Buchmüller
Shifting the SBB crocodile at the Swiss Museum of Transport
Production: Verkehrshaus Luzern
Shifting the RhB crocodile at the Swiss Museum of Transport
Production: Verkehrshaus Luzern
In record time
Credits: Rebecca Buchmüller
Montylift – the Agile Muscleman
Credits: Rebecca Buchmüller & Tino Zimmermann
Relocation of Troxler AG
Credits: Rebecca Buchmüller
Relocation of Ramseier AG
Credits: Rebecca Buchmüller
Company portrait
Credits: Tino Zimmermann & Rebecca Buchmüller
Celebration Film
Credits: Tino Zimmermann & Rebecca Buchmüller
New Logo
Credits: Reklame-Technik AG