Filme

Delivery and installation of eight new rollers for Lindt & Sprüngli (Schweiz) AG.
Video: Lukas Pitsch / proImageHub

Complex lifting of a 7.5 tonne MRI at Lucerne railway station.
Video: Lukas Pitsch / proImageHub

Unloading and setting up a 43t machining centre in Eschenbach.
Video: Lukas Pitsch / proImageHub

Exchange of three heavy-duty machines at Sauber Motosport AG in Hinwil.
Video: Lukas Pitsch / proImageHub

Stacking of 26 steel staircase elements.
Video: Lukas Pitsch / proImageHub

We delivered a 5.2-ton emergency power generator and installed it on the roof.

Video: Lukas Pitsch / proImageHub

Unloading and bringing in a 38t universal machining center.
Video: Lukas Pitsch / proImageHub

Bringing in a 16t underfloor lathe in the VBZ tram depot in Zurich.
Video: Lukas Pitsch / proImageHub

Bringing in an 85t press, hanging on two mobile cranes and flying transfer to lifting column system.
Video: Lukas Pitsch / proImageHub

Unloading and bringing in more than 50 truckloads for the new Emmi cheese factory.
Video: Lukas Pitsch / proImageHub

Industrial relocation of a 12t machine through the roof and bringing a second one into the production hall.
Video: Lukas Pitsch / proImageHub

Replacing an 18t can filling line incl. can seame at Feldschlösschen.
Video: Lukas Pitsch / proImageHub

Bringing in a 23t CNC machining center into a production hall.
Video: Lukas Pitsch / proImageHub

Five production lines move to a new factory.
Video: Lukas Pitsch / proImageHub

Replacement of two escalators at the SBB station at Geneva Airport.

A 30-tonne press had to be taken out of the production hall at Heggli & Gubler AG.
Video production: Lukas Pitsch / proImageHub

Bringing in a heavy 65t tank into the BAUBERGER heavy goods warehouse in Elgg (ZH).

Relocating several manufacturing units with a weight of up to 18t each at Hans Eberle AG.
Video production by Lukas Pitsch / proImageHub

Bringing a new panetary strander machine into the production facilities at Huber+Suhner AG.
Video production by Lukas Pitsch / proImageHub

20 trucks full of material for a new production plant at Lindt & Sprüngli.
Video production by Lukas Pitsch / proImageHub

The new corporate film of BAUBERGER AG. This is how factories travel in 2020 and in the future!
Video production by Lukas Pitsch / proImageHub

BAUBERGER was responsible for moving existing machines and unloading at Stöckli Swiss Sports AG, bringing in, placing, including pre-leveling new machines and systems between 1.5 and 7 tons.
Video production by Lukas Pitsch / proImageHub

In order to further optimize the production processes, Wilhelm Schmidlin AG in Oberarth (CH) purchased a new hydraulic 1400 ton press from Hydraulico. BAUBERGER was not only responsible for bringing in the new press, but also managed the unloading and erection process while Welti-Furrer Pneukran und Spezialtransporte AG transported the press from Denmark to Switzerland. A completely new production hall has been built for the new press with a dead weight of 165t and a height of over 7m.
Video production by Lukas Pitsch / proImageHub

As a reaction to the COVID-19 pandemic, the federal government and the canton of Zurich purchased manufacturing machinery to ramp up production of face masks in Switzerland. As being part of www.luftbruecke.ch BAUBERGER carried out the transportation of two face mask production machines (approx. 60m3) for Autefa AG and related auxiliary material (another approx. 60m3) for FLAWA Consumer GmbH from China to Switzerland.

Three new ENGEL injection moulding machines were recently delivered and installed at the company premises of Nolato Treff in Degersheim. The three units with a weight of up to 20 tonnes were lifted up by a 100-tonne mobile crane from the truck to our auxiliary platform at a height of five meters.
Video production by Lukas Pitsch / proImageHub

Bringing-in of the two MRI’s „Magnetom Prisma“ and „Magnetom Terra“ into the new building of sitem-insel in Bern. The MRI’s were moved to the basement floor through a floor opening with a size of 3x3m (while not having more than a few centimeters of space left) with our HUBYLIFT.
Video production by Lukas Pitsch / proImageHub

After closing-time of a shopping center the BAUBERGER elves started with their work. Within 24-hours (Saturday evening until Sunday afternoon) they removed six escalators and replaced them with six new ones.
Video production by Lukas Pitsch / proImageHub

COMET Group in Flamatt is moving into a new production site. Again BAUBERGER is th proved partner for this relocation.
Video production by Lukas Pitsch / proImageHub

Bringing-in procedure of a filling system CFA 612-35 at Elsa in Estavayer-le-Lac (Switzerland).
Video production by Lukas Pitsch / proImageHub

Integration of a 17-to steamer on a height of 3m into a new production line for material processing at Cilander AG in Herisau
Video production by Lukas Pitsch / proImageHub

Bringing-in procedure of a 7,2-ton CNC lathe with a mobile crane and transport box directly to the 2nd floor
Video production by Lukas Pitsch / proImageHub

72 tons export to the USA
Video production by Rebecca Buchmüller

Shifting the SBB crocodile at the Swiss Museum of Transport
Production: Verkehrshaus Luzern

Shifting the RhB crocodile at the Swiss Museum of Transport
Production: Verkehrshaus Luzern

In record time
Credits: Rebecca Buchmüller

Montylift – the Agile Muscleman
Credits: Rebecca Buchmüller & Tino Zimmermann

Relocation of Troxler AG
Credits: Rebecca Buchmüller

Relocation of Ramseier AG
Credits: Rebecca Buchmüller

Company portrait
Credits: Tino Zimmermann & Rebecca Buchmüller

Celebration Film
Credits: Tino Zimmermann & Rebecca Buchmüller

New Logo
Credits: Reklame-Technik AG