Now even faster in Western Switzerland

Dismantling machines at one location, pushing them onto the barelle (platform), transporting them to another location, reintroducing them into a new building and reassembling them – that is definitely part of our daily tasks. For example, we were recently working at Kolma AG in Bern. In two stages, we moved several machines through one façade opening and bring them back into the production hall on the other side of the building as part of this factory relocation. The machines were also dismantled and made ready by our technicians for the barelle (platform) transportation and reassembled at the new location.

Projects like these reflect our core business, which we have been operating from Elgg for over 50 years throughout Switzerland, in neighbouring countries and sometimes even worldwide. However, for almost two years now, factories in western Switzerland have been travelling even more efficiently thanks to the opening of our new site in Biel, including a heavy goods warehouse. In these almost two years, we have already handled a great many projects, built and expanded great collaborations, and feel right at home at our second location in Western Switzerland.

Operational Equipment

  • Assembly trolley
  • 20 tonne barelle (platform)
  • Mobile crane from Welti-Furrer
  • Various trolleys
  • Hand pallet truck 3t

 

Team

Sven, René, Oswald

Pictures: BB/Sven Schneiter